Full Site Search  
Sun Jul 23, 2017 16:22:54 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

<<prev entry    next entry>>
Blog Entry# 1353328  
Posted: Jan 28 2015 (08:29)

7 Responses
Last Response: Jan 28 2015 (09:14)
  
Rail News
0 Followers
1633 views
Rail BudgetSWR/South Western  -  
Jan 28 2015 (06:46)   High-speed B’luru-Chennai rail may be scrapped
 

rdb*^   130870 news posts
Entry# 1353328   News Entry# 210570         Tags   Past Edits
Bengaluru: Your dream of zipping to Mysuru or Chennai on a speeding train isn't likely to happen now. Reason: the much hyped high speed rail project connecting Bengaluru to Chennai and Mysuru is set to be grounded. Sources in the Rail Vikas Nigam Limited (RVNL), New Delhi, told TOI that the project involves too many changes en route (Bengaluru-Mysore-Chennai) to convert the existing tracks to accommodate speeding trains. "A high-level delegation of China Railway Eryuan Engineering Group Co Ltd (CREEC), which did the track inspection of the 500 km corridor, has suggested straightening of over 100 curves with more than five degrees angle each. Also, this entails acquiring extra land, rehabilitating people and rebuilding bridges and level crossings at different points. This needs huge investment of multiple crores and time. If we want to build new tracks, it may cost more than Rs 200 crore per km. Hence, it may not...
more...
be feasible to implement the project along the corridor," officials at RVNL connected with the project told TOI on Tuesday. The Chinese delegation, which conducted the track inspection in November last year, found as many as 145 curves along the proposed Chennai-Bengaluru-Mysuru route, of which 135 are located between Bengaluru and Mysuru. "Chinese experts have called for straightening of the curves. Only then can the existing train speed of about 80 kmph be increased to 160 kmph-200 kmph," said another source. Sources said though the final report of the Chinese delegation is expected in February this year, there is little hope that Indian Railways will go ahead with the project as announced in the budget last year by the Narendra Modi government.
Alok Tiwari, chief project manager (Bangalore field office), RVNL did agree about the difficulties in implementing the high speed rail project along the said corridor. "There are many practical problems. However, a final call on the project will be taken only after the report submission by the Chinese delegation," he added. A senior official from the South Western Railway (SWR) said another problem with the corridor is that it is a very busy corridor and is difficult to stop operations for long to implement the project. "As many as 27 trains ply between Bengaluru and Mysuru and 21 along the Chennai route," he added.
WHAT IS THE PROJECT ALL ABOUT?
The high speed rail project, one among the nine such corridors announced in the Railway budget, promised to reduce travel time between major cities. The plan was to upgrade the present railway network to achieve greater speeds as bullet trains would require completely new infrastructure. It can be noted here that a team of experts from High Speed Rail Corporation, which conducted field studies along the Chennai-Bengaluru-Mysuru corridor, had also expressed reservations on feasibility of the high speed rail project.
Box:
SPEED ON TRACKS
3 hours is average time taken by trains to cover the 139km distance between Bengaluru and Mysuru. Average speed of trains is 60 to 80 kmph. Between Bengaluru and Chennai, the speed is 70 kmph to 90 kmph.
Shatabdi Express between Chennai and Mysuru via Bengaluru runs at 90 kmph. To cover one way it takes around 7 hours.
In China, the average speed of trains is 200 kmph. Experts there are developing tracks that can enable trains to run at a speed of 300-350 kmph. The fastest train there can attain speed up to 480 kmph.

2 posts - Wed Jan 28, 2015

  
1272 views
Jan 28 2015 (08:52)
यन्त्रविन्यासYantravinyas   19811 blog posts   427 correct pred (89% accurate)
Re# 1353328-3            Tags   Past Edits
May be so called "Techies" might have asked for bullets..:P

  
1464 views
Jan 28 2015 (08:53)
Guest: 7d636174   show all posts
Re# 1353328-4            Tags   Past Edits
Good news. There is no need for High Speed trains at present in India.
If they can show in interest in work, ask them to cut slack for many trains, regulate traffic properly and attain an avg speed of 65kmph for SF's

  
1343 views
Jan 28 2015 (08:55)
SRG*^~   35725 blog posts   173953 correct pred (76% accurate)
Re# 1353328-5            Tags   Past Edits
Slowly ground reality is showing up...Similar could be the fate of other projects.

  
1299 views
Jan 28 2015 (09:05)
Pained to know Boeing 777 landcrashed~   23275 blog posts   21101 correct pred (68% accurate)
Re# 1353328-6            Tags   Past Edits
What China can afford India can't...the sooner govt understands the better for the country..In China most of the bullet trains are WE..here even the govt can't afford to run a slowest passenger if it doesn't fetches profit..

  
1523 views
Jan 28 2015 (09:14)
Kerala Needs Own WCoR Zone   230 blog posts   17 correct pred (81% accurate)
Re# 1353328-7            Tags   Past Edits
Disappointing. However, this was expected and soon this will be case for all such "semi-high speed" tracks I guess. Whatever happened to the Gatimaan Express?? Forget 200 kph, can they atleast increase the MPS to 120-130 kph in this route? That might be possible with enough banking and strengthening of track... If the government can't do it, they shouldn't give useless promises to people. This govt is getting to be just like the previous ones. Bullet train it seems. We are doomed to be stuck traveling in 50 kph trains for all time :(
Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.