Jan 29 2015 (10:28) GR/Kalaburagi Junction (Gulbarga) (4 PFs)
SunilKulkarni~
SunilKulkarni~ 2006 blog postsStatus of electrification between Raichur and Gulbarga stations ( Part of Mumbai-Chennai trunk route and Mumbai-Bangalore Trunk route)
Poles seen all way between Raichur and Gulbarga and cabling done in most of stretches except Wadi towards gulbarga...
Wadi Jn all electrification done
At saidapur spotted huge stack of track beds may be used for Mahaboobnagar-Munirabad new line u/c
Looks...
more...
Poles seen all way between Raichur and Gulbarga and cabling done in most of stretches except Wadi towards gulbarga...
Wadi Jn all electrification done
At saidapur spotted huge stack of track beds may be used for Mahaboobnagar-Munirabad new line u/c
Looks...
more...
14 Posts
Please check below
Pit Line are washing lines with open dumping pit at base, throughout the track.
- These pit are utilized to drain out sewage water (Washroom & Coach Interior Cleaning).
- Thorough Checking & Repairing Coach Base parts
-...
more...
Pit Line are washing lines with open dumping pit at base, throughout the track.
- These pit are utilized to drain out sewage water (Washroom & Coach Interior Cleaning).
- Thorough Checking & Repairing Coach Base parts
-...
more...
#electrification b/w Raichur and Guntakal,how much it has progressed
Not completely work is going on in sections.... it may take another year or so....