Search Forum
Blog Entry# 1364533
Posted: Feb 09 2015 (13:30)
No Responses Yet
No Responses Yet
Now that's a good concept. Few tips from me if you want to accept.
1) TT is flawed, needs to be rectified.
2) While rectifying the TT please be careful so that the train doesn't become too fast. Overall TT shouldn't be less than 15.5-16Hrs as per current track condition with MFP-BSB in 5Hrs 30-45Mnts, BSB-ALD in 2Hrs 15-30Mnts, ALD-DLI in 7Hrs 15-30Mnts.
3)...
more...
1) TT is flawed, needs to be rectified.
2) While rectifying the TT please be careful so that the train doesn't become too fast. Overall TT shouldn't be less than 15.5-16Hrs as per current track condition with MFP-BSB in 5Hrs 30-45Mnts, BSB-ALD in 2Hrs 15-30Mnts, ALD-DLI in 7Hrs 15-30Mnts.
3)...
more...