Search Forum
Blog Entry# 1404521
Posted: Mar 22 2015 (23:52)
7 Responses
Last Response: Mar 23 2015 (14:13)
7 Responses
Last Response: Mar 23 2015 (14:13)
All of us think that IR trains should run on time.
As we know our infrastructure is not capable of running these trains on time practically.
Also bitter truth is Infrastructure not gonna improve in 2-3 years drastically.
So there should be some other way to runs trains on time.
i...
more...
As we know our infrastructure is not capable of running these trains on time practically.
Also bitter truth is Infrastructure not gonna improve in 2-3 years drastically.
So there should be some other way to runs trains on time.
i...
more...
1 Public Posts - Sun Mar 22, 2015
Another option is to shift some trains on the alternate routes like the some trains on the mgs-cnb section can be shifted to bsb-unnao-cnb rail line via unchahar..and by making the cpr-bsb-ald section double electrified some trains of the bju-mgs section can be shifted there..
5 Public Posts - Mon Mar 23, 2015