Terrific System Management By Central Railway, Mumbai Division
Gap between 2 EMU Just 100m
Flickr Link
Gap between 2 EMU Just 100m
Flickr Link
8 Public Posts - Mon Mar 23, 2015
One correction:
Kindly introduce 2-3 Freight traffic on the same line wherein these Local runs....The scheduling wll not remain the same...
All mentioned Locals on the line have approximately same Load & high on pick-up which makes easy line clearance...
Same isnt true with Chord Line Section, where different mix of train loads ply on same track, which delays line clearance & in-turn lead...
more...
Kindly introduce 2-3 Freight traffic on the same line wherein these Local runs....The scheduling wll not remain the same...
All mentioned Locals on the line have approximately same Load & high on pick-up which makes easy line clearance...
Same isnt true with Chord Line Section, where different mix of train loads ply on same track, which delays line clearance & in-turn lead...
more...
5 Public Posts - Tue Mar 24, 2015
1 Public Posts - Wed Mar 25, 2015