Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal - Train Search + Time-Tables + Avl Calendar + Forum

नहीं कोई गम, रेलवे से हैं हम - Aman

Search Forum
<<prev entry    next entry>>
Blog Entry# 1435032
Posted: Apr 19 2015 (22:51)

7 Responses
Last Response: May 25 2015 (16:11)
2 Followers
Info Update
22841 views
21

★★★
Apr 19 2015 (22:51)   ED/WAG-7/24617
 
guest   6387 blog posts
Entry# 1435032            Tags   Past Edits
VISION 2020
IMPLEMENTATION PLAN
...
more...
ELECTRIC LOCOMOTIVES
In this blog I am Sharing Indian Railways Vision 2020 Implementation Plan on Electric Locomotives of Indian Railways. Please click on the following Link to see this Vision 2020 Plan in detail
click here
I am providing the screenshots of the following Parts of Vision 2020 Plan
1 Electric Locomotives to be acquired
2 ACTION PLAN
Please note that the number of WAP 4 reduces with year and in 2020 we don't have any WAP-4 as per plan of Railways.
Attached Image:
BHEL WAG-7 of Erode
Image Link: click here

Translate to English
Translate to Hindi
Show AI Response

16 Posts

2702 views
3

Apr 25 2015 (20:04)
IndianTrainFanonTwitter~
IndianTrainFanonTwitter~   10340 blog posts
Re# 1435032-19              
So in the year 2020, you will write an obituary for the WAP-4 Class Electric Loco on IRI.
.
WAP-1to4 Class Non-3Phase Electric Indian Locos... RIP (1980-2020)
.
These locos started their earlier runs with
...
more...
trains like the Howrah Rajdhani. Their progressive manufacturing lead IR to phasing out the WAM-4 locos in 1997. Now these locos with their last variants of the P-4 model with the arrival of latest 3-Phase technology electric locos named WAP-7. IR is also planning a WAP-7D variant to haul trains at 140-160 Kmph on 9 specific routes. May the traditional electric locos be remembered by IRI for their immense contribution on Indian tracks under perverse Indian conditions _/\_

Translate to English
Translate to Hindi
Show AI Response

2882 views
2

Apr 25 2015 (20:25)
guest   6387 blog posts
Re# 1435032-20               Past Edits
Sir,
As per Vision 2020 it is Seen. Here some points are to be noted:
If you kindly have a look at /blog/post/1440076(Vide News Entry# 221976) about the Subject:
" Indian Railways in 'severe financial crisis' again, finds panel headed by ex-Rail minister Dinesh Trivedi"
You
...
more...
Can find that the Report which is Shared here by this Panel tells the following
1 Indian Railways have a huge drainage of Money for the Depreciation of it's Over Aged Assets and in maximum cases Depreciation is under estimated.
2 IR have a increased Per Unit Cost in both Passenger and Freight Sector which resulting in a "Negetive Operating Ratio" in both Freight and Passenger Sector
Operating Ratio= Operating Expense/Net Sales
In both Sectors Sales/Revenue figure is much less than Operating Expense.
Most importantly, IR can't generate enough Cash Flows from it's Passenger & Freight Operations that can be utilised for Procuring New Rakes, Wagons & Locomotives on the other hand drainage of money for maintaining these Over Aged Assets.
The Panel also comments that the "Financial Position of IR" is now not Sufficient enough to carry on it's Operation as a "Going Concern".
So, as per my Rail Fanning Experience I can say
1 3 Phasers will have less maintenance cost than Tap Changers
2 As per Current CLW situation Tender For Tap Changers are now becoming impossible due to availability of material.
3 IR can save both Power and Money in three phaser for it's "Regenerative braking"
4 Though CLW 3 Phaser cost 13 Crore(WAP 7 & WAP 5)[7 Crore more than Tap Changer WAP-4] but the aftermath costs of 3 Phasers are Less as compared to Tap Changers.
5 Not now, but after some years IR has to say "Good Bye" to it's Tap Changer" Fleets and have to use 3 Phaser for it's numerous Monetary and other benefits.
Thanks & Regards
Nilanjan Ray

Translate to English
Translate to Hindi
Show AI Response

2479 views
1

May 25 2015 (16:11)
Raju Sharma   602 blog posts
Re# 1435032-21              
Isme 9000hp loco production 205-16 me dikha raha hai. Factory ka abhi tak tender bhi nahi hua production add kar liya. Great.
Translate to English
Translate to Hindi
Show AI Response
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy