Search Forum
Blog Entry# 1531824
Posted: Jul 04 2015 (08:36)
1 Responses
Last Response: Oct 06 2015 (00:58)
1 Responses
Last Response: Oct 06 2015 (00:58)
Yesterday a sudden trip to TPJ. Went by Vaigai. To my luck, got reserved seat after chart preparation.
Doubling – CGL to KGZ single track only. Lines are ready to rock. Inspection pending, I think. KGZ to VM fully doubled. VM to TVNL works going on. TVNL to VRI tracks ready; inspection pending. VRI to ALU works going on. ALU to VLDE already doubled. VLDE to GOC works going. GOC to TPJ already doubled.
Doubling – CGL to KGZ single track only. Lines are ready to rock. Inspection pending, I think. KGZ to VM fully doubled. VM to TVNL works going on. TVNL to VRI tracks ready; inspection pending. VRI to ALU works going on. ALU to VLDE already doubled. VLDE to GOC works going. GOC to TPJ already doubled.
The AC CC coaches in this train doesn't have any temperature control system.
Sometimes the temperature may go as low as 16 degrees and you have to shut the AC vent manually.
The twist here is some of the ac vents are already broken that you cant close them.
Sometimes the temperature may go as low as 16 degrees and you have to shut the AC vent manually.
The twist here is some of the ac vents are already broken that you cant close them.