Search Forum
Blog Entry# 1725913
Posted: Jan 31 2016 (19:37)
6 Responses
Last Response: Feb 05 2016 (13:11)
6 Responses
Last Response: Feb 05 2016 (13:11)
Jan 31 2016 (19:37) 22351/Patliputra - SMVT Bengaluru SF Express | MSU/Mosur (4 PFs) | RPM/WAP-7
guest 259 blog posts

22351 Patliputra - Yesvantpur Express At Speeding Between Mas-Ajj Strech Route Needs Always !!
#SB Station Borad Of Name Mosur Station Village
#Ahannal2016
#SB Station Borad Of Name Mosur Station Village
#Ahannal2016
1 Posts
Haha generally every train will show its power between this stretch. Now MAS - AJJ will be 4 track two for local and two for express so non stop run. May be the problem is due to electrical maintenance between villivakkam and ambattur.
What is the doubling and electrification status of Mas to Ajj ? Is it partly doubled?
MAS TO TRL 4LINES ALREADY AVAILABLE AND ELECTRIFIED.
TRL TO AJJ 4 LINES ELECTRIFIED BUT CRS INSPECTION PENDING FOR 4TH LINE. 3 LINES ALREADY EXIST
TRL TO AJJ 4 LINES ELECTRIFIED BUT CRS INSPECTION PENDING FOR 4TH LINE. 3 LINES ALREADY EXIST