Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

शिव की जटाओं से बहती है शिव गंगा - Divyanshu

Search Forum
<<prev entry    next entry>>
Blog Entry# 1733270
Posted: Feb 08 2016 (17:26)

11 Responses
Last Response: Feb 11 2016 (00:47)
General Travel
23860 views
9

Feb 08 2016 (17:26)   12873/Jharkhand Swarna Jayanti Express (Via Barkakana) (PT) | PTRU/Patratu (3 PFs) | PTRU/WDM-3A/16742R
 
ChunarFort~
ChunarFort~   514 blog posts
Entry# 1733270            Tags   Past Edits
Pic 1: Jharkhand swarna jayanti express arriving at Patratu. First run post fog cancellation
Pic 2-3 : Patratu station.
Pic 4: Halting at Renukut station.
Pic 5: Chopan junction. Xing with Santragachi Ajmer express 18009 (on the right) . left side is jharkhand express.
Pic
...
more...
6-8: night time, Chunar junction. Engine changed to electric loco WAP1 22060. Train arrived before time. Toofan express also arrived but was put behind 12873.

Translate to English
Translate to Hindi

6 Posts

13636 views
1

Feb 09 2016 (23:58)
ChunarFort~   514 blog posts
Re# 1733270-7              
Fatehpur...stopped there too. Arrived at Kanpur finally.
Translate to English
Translate to Hindi

6867 views
0

Feb 10 2016 (02:10)
Sanz~
Sanz~   8511 blog posts
Re# 1733270-8               Past Edits
Isko twin diesel engines kyun milta hai, bahut lambi hai ya bahut slope gradient hai??
Aur chunar mein 1 hr + power change.
Dono engine ek ek karke nikalta hai kya
Translate to English
Translate to Hindi

5974 views
0

Feb 10 2016 (08:39)
Hiiiiiiii
Hiiiiiiii   9797 blog posts
Re# 1733270-9              
Single engine se utna pick up nahi milta hai
Translate to English
Translate to Hindi

5834 views
0

Feb 10 2016 (08:44)
Hiiiiiiii
Hiiiiiiii   9797 blog posts
Re# 1733270-10              
Lambi to hai 24 coaches
Translate to English
Translate to Hindi

7509 views
0

Feb 11 2016 (00:47)
ChunarFort~   514 blog posts
Re# 1733270-11               Past Edits
The twin engines were removed within minutes. The electric loco was immediately started. But was kept waiting in loop line for ~40 minutes. After being connected, for more than 30 mns it had to wait for green signal.
Bhai, lambi train hai +slope gradient bhi hai bahut jyada , between Chopan and Chunar....(its called rajghat of I remember correctly)
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy