Search Forum
Blog Entry# 1781278
Posted: Mar 27 2016 (13:47)
13 Responses
Last Response: Mar 27 2016 (17:00)
13 Responses
Last Response: Mar 27 2016 (17:00)
India’s ‘fastest train’ beats first Shatabdi by all of two minutes
March 22 trial shows Gatimaan remains hobbled by track, speed restrictions; Chairman, Rail Board, says high-speed trains world over run on straight tracks.
" The 12049/50 Gatimaan Express, with three decades worth of advancement in railway technologies would take 113 minutes to reach the Taj Mahal city. "
March 22 trial shows Gatimaan remains hobbled by track, speed restrictions; Chairman, Rail Board, says high-speed trains world over run on straight tracks.
" The 12049/50 Gatimaan Express, with three decades worth of advancement in railway technologies would take 113 minutes to reach the Taj Mahal city. "
8 Posts
this is not fault of train, Gatiman ne to nahi kaha tha ki track par aana khelne aur na hi GAtiman PAtri se utarkar un bacho ke pichhe bhagi thi.
aur wese bhi railway line koi khelne ki jagah nahi.
aur wese bhi railway line koi khelne ki jagah nahi.
yes but railway cannot be insensitive to death on tracks.
also safety issue is there because if some cattle come on track when train at 160 then train ko bhi damage ho sakta tha..
also safety issue is there because if some cattle come on track when train at 160 then train ko bhi damage ho sakta tha..
yes, this is serius issue,
this train is 50% more faster then other normal duperfast trains on this route,.
this train is 50% more faster then other normal duperfast trains on this route,.
Agar People aise kaam Karte Rahe to High-tech Speed Train ka Network Elevated hoga ya Underground jiske liye Railway k Paas Fund Nahi Hai.
Problems Faced
+ Time Lossed between NDLS & NZM
+ Mathura Yard of the Railways that is enroute. Signalling system there needs to be upgraded and made more seamless for the train.
+ People Crossing tracks and Causing Accidents.
+ Time Lossed between NDLS & NZM
+ Mathura Yard of the Railways that is enroute. Signalling system there needs to be upgraded and made more seamless for the train.
+ People Crossing tracks and Causing Accidents.