Search Forum
Blog Entry# 1798879
Posted: Apr 11 2016 (15:37)
No Responses Yet
No Responses Yet
Apr 11 2016 (15:37) SDLE/Swadinpur (4 PFs)

Anupam Enosh Sarkar^~
Anupam Enosh Sarkar^~ 32881 blog postsAfter so long period, this diesel section has undergone major changes and catenaries have been installed everywhere (you can spot some in the pic itself) and THIRD line is under construction. Meanwhile, a long zoom shot of SB of this small halt station which is a good place for RF.