Search Forum
Blog Entry# 1821350
Posted: Apr 26 2016 (17:27)
10 Responses
Last Response: Apr 28 2016 (15:05)
10 Responses
Last Response: Apr 28 2016 (15:05)
Today covered 2 mins delay between ALD - MGS. Departed ALD 1hr 25m late but reached MGS 1hr 23m late. Has it happened ever before? Always delay was added on this section.
Pairing train 12873 ke saath pata nahi kya problem hai, chopan tak right time aati hai lekin chopan se chunar ke beech 1se 2 ghante har run mein delay ho rahi rahi.
Pairing train 12873 ke saath pata nahi kya problem hai, chopan tak right time aati hai lekin chopan se chunar ke beech 1se 2 ghante har run mein delay ho rahi rahi.
5 Posts
Wo trains to pehle bhi chalti thi, lekin pehle JSJ chopan - chunar ke beech shayad hi kabhi late hoti thi. Jab se LC chunar shift hua hai tabhi se ye haalat hai.
Jahan ek normal halt scheduled tha waha loco change karane page ye log aur wo bhi CAR per haha loco change karne ke liye loco k bahut door tak jaana padta hai, is wajah se train apne path se bhatak jaati hai aur phir Pure raaste delayed rahti hai.
Ek hi solution hai , Aur passing station banana hoga chopan chuanar ke beech , kam se kam 3 . mps 90 karna hoga atleast .
Waise near future maybe 2016 year end tak jsj 12873-74 electric loco se run karne lagegi . Hte to chopan , ghd to cpu almost electrified 80 % work done . Fir loco electric loco change na karke bs electric loco ke aage twin wdm3a laga de and usko chunar me de attach kar ke electric loco par run kara de . Iss step se 30 mins save honge .
Waise near future maybe 2016 year end tak jsj 12873-74 electric loco se run karne lagegi . Hte to chopan , ghd to cpu almost electrified 80 % work done . Fir loco electric loco change na karke bs electric loco ke aage twin wdm3a laga de and usko chunar me de attach kar ke electric loco par run kara de . Iss step se 30 mins save honge .
Is any example of such train ??? In which diesel loco hauls with dead electric loco.
Regular toh nahi but jab divert hoti hai trains iss mode me run karti hai , See purushottam diverted via chopan then it ran like this . pics by sunil sir /blog/post/1257934
Waise bhi 100 km hai chopan to chunar , tHis can be done , By 2016 end ghd to cpu will be electrified .
Waise bhi 100 km hai chopan to chunar , tHis can be done , By 2016 end ghd to cpu will be electrified .