Full Site Search  
Fri Jul 28, 2017 14:29:01 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

<<prev entry    next entry>>
Blog Entry# 1821846  
Posted: Apr 27 2016 (00:54)

6 Responses
Last Response: Apr 27 2016 (14:32)
  
General Travel
0 Followers
1470 views
Apr 27 2016 (00:54)   LKO/Lucknow Charbagh NR (8 PFs)
 

Proud atheist~   4469 blog posts   37 correct pred (63% accurate)
Entry# 1821846            Tags   Past Edits
I think to decongest the congestion at Lucknow first of all either LKo NR should be merged in NER or Lucknow NEr should be merged in NR..i mean both the station should belong to a single zone for better understanding between the officials and better co ordination.And after that all the terminating/originating trains and the trains falling under general waiting quota should be shifted to Lucknow ner and all the passing trains should be shifted to LKO nr..it will avoid rake reversal of many trains and hence there will be lesser congestion...and like bhopal and surat etc lko nr can handle a lot of trains with ease...

1 posts - Wed Apr 27, 2016

  
963 views
Apr 27 2016 (13:40)
Beginning of the Great Indian Success Story   300 blog posts   445 correct pred (57% accurate)
Re# 1821846-2            Tags   Past Edits
Agreed with your points, but both NR and NER have a lucknow division, with their respective drm's, head office's, etc. all situated in lucknow.
So, it's quite difficult to merge the stations into a single zone.

  
931 views
Apr 27 2016 (14:01)
Proud atheist~   4469 blog posts   37 correct pred (63% accurate)
Re# 1821846-3            Tags   Past Edits
Prabhu ji ne jo trains ki punctuality sahi karne ki jo baat kahi hai uske liye ye kaam karna bahut zaruri hai..

  
651 views
Apr 27 2016 (14:05)
Lucknow Metro~   2360 blog posts   9 correct pred (47% accurate)
Re# 1821846-4            Tags   Past Edits
What we also need is a Lucknow bypass line. Lucknow NR is far too congested when coming from GKP/PBH/SLN side, especially during the night. A freight track coming from Amausi side to Utratia exists, maybe it could be developed(like the Kanpur bypass line).

  
768 views
Apr 27 2016 (14:13)
rivoluzione   66 blog posts   300 correct pred (82% accurate)
Re# 1821846-5            Tags   Past Edits
Reorganization of NR & NER is need of the hour for better handling of trains.

  
722 views
Apr 27 2016 (14:32)
Proud atheist~   4469 blog posts   37 correct pred (63% accurate)
Re# 1821846-6            Tags   Past Edits
Yup..thats what i was saying..
Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.