Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

TKD WDP-4B "प्रतीक" - रंग ऐसा कि हर किसी को प्यार हो जाए - Anubhav Kashyap

Search Forum
<<prev entry    next entry>>
Blog Entry# 1883345
Posted: Jun 07 2016 (00:20)

5 Responses
Last Response: Jun 14 2016 (22:50)
Poll
6960 views
36 votes
2

Jun 07 2016 (00:20)   12259/Sealdah - Bikaner AC Duronto Express
 
guest   6387 blog posts
Entry# 1883345            Tags  
Should the Decision of IR of 3-Phase Link withdrawal from 12259/12260 is justified ?
Translate to English
Translate to Hindi
NO vote
Yes It's absolutely justified IR has taken the Correct Decision by giving the Charge of this Train to WAP-4
22%
8
No IR has taken Completely wrong decision by withdrawing WAP-5/WAP-7 from this Train as 3-Phase Link was better than the Present Link with this Train
67%
24
Don't have any idea regarding this
11%
4

3891 views
1

Jun 07 2016 (00:25)
Mayank Singh~   2372 blog posts
Re# 1883345-1              
Could any body explain what happened? Is the 3-phase link[which was withdrawn] superior to the newly given link?
Translate to English
Translate to Hindi

3775 views
1

Jun 10 2016 (09:25)
TrainsOnHoliday~
TrainsOnHoliday~   1156 blog posts
Re# 1883345-2              
12259/60 lost its charm without P7
Translate to English
Translate to Hindi

3829 views
2

Jun 10 2016 (11:04)
VPEEYYT~
VPEEYYT~   1821 blog posts
Re# 1883345-3               Past Edits
I dont think rlys action regarding links are justified/not. But when you start conversation with some LP or any other staff those who know about the link will give you an answer like, which ever loco is available we use it for xyz train(xyz can be any train and sometimes at HWH and NDLS I came to know about WAP-7's that they are specifically for the Rajdhanis and long hauler with lots of stoppages).
Coming to the voting topic, When Poorva was in ICF mode , it had 24 coaches and ICF coaches are heavier than LHB so why they didn't gave WAP-7 earlier as the way Kalka was provided.
If
...
more...
WAP-7 are to provide hotel load to the LHB coaches then its fine, but again we cant find any of the HOG WAP-7 working with their HOG on. So it's my opinion rly has rights to assign link as per their choice and availability.
Now soppose if WAP-7 comes to SER, to which train they will provide the WAP-7, 12839/40/41/42 -Durontos-shatabdi's or to AC SF's(plenty of high patronage trains). They will provide WAP-7 to the train which really needs it, it's that simple.
So in the regions where WAP-7's aren't available , WAP-4's are doing awesome service. Hence it depends upon the section and ultimately to the controller for the punctuality.
Lastly - for WAP-7's ,group them up.
HOG WAP-7's - only for pure LHB/Rajdhani's
WAP-7 - For Heavy hauling (Trains with 24 coaches and lots of stoppages).

Translate to English
Translate to Hindi

3480 views
0

Jun 14 2016 (22:48)
guest   420 blog posts
Re# 1883345-4              
May give WAP 7 still punctuality will be same punctuality will improve then only when NCR will not it troll behind 12560 till ALD or unless 12560 get 130 MPs if get them good for fastest dur otherwise going to never ending problem
Translate to English
Translate to Hindi

3227 views
0

Jun 14 2016 (22:50)
guest   420 blog posts
Re# 1883345-5              
However in terms of punctuality 12259 is much better as does not have to troll any SF train in NCR whereas in case of 12260 totally opposite as NCR did not allow to overtake 12560
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy