-मार्च तक पूरा हो जायेगा 120 किलोमीटर रूट का विद्युतीकरण, अप्रैल में होगा ट्रायल
-अप्रैल...
-अप्रैल...
read more... माधोसिंह स्टेशन तक दौड़ेगी इलेक्ट्रिक ट्रेन
4 Posts
Can only be used for good trains upto container depot at madhosingh.
But i still doubt ki news walo ne sahi likha hai
But i still doubt ki news walo ne sahi likha hai
Is container depot @madhosingh operational i heard that it was closed..?
Waise Sinha ji k project h..Lekin mujhe 2017 year end tak hi operational hone k chances lag rahe h.
Waise Sinha ji k project h..Lekin mujhe 2017 year end tak hi operational hone k chances lag rahe h.
M not sure whether it is operational or not but had spotted goods train sometime.
As per my discussion with one of the official of NER BSB, he said currently focus is on doubling b/w Aurihar and BSB; electrification b/w BSB and ALY. Also 4th washing line is under construction at MUV and as well there is construction of washing line at MAU which might get operational by DEC
As per my discussion with one of the official of NER BSB, he said currently focus is on doubling b/w Aurihar and BSB; electrification b/w BSB and ALY. Also 4th washing line is under construction at MUV and as well there is construction of washing line at MAU which might get operational by DEC
4th washing line @muv..Good to know that.
So there are the chances of few trains terminating or New trains from MUV.
So there are the chances of few trains terminating or New trains from MUV.
Yes..trains from BSB will be shifted to MUV and BCY because of remodeling at BSB