Search Forum
Blog Entry# 1957123
Posted: Aug 10 2016 (08:10)
54 Responses
Last Response: Aug 13 2016 (15:32)
54 Responses
Last Response: Aug 13 2016 (15:32)
Aug 10 2016 (08:10) 07762X/Tirupati - Vishakapatnam Double Decker Special
Rajesh~
Rajesh~ 2339 blog postsSCR is giving very odd timings for DD and later saying very poor response. This can start TPTY after 6am
60 Posts
well why dont you look at the way GDR handles the trains then buddy...then you will have a clear idea ....the trains which is coming towards GDR will always gets late even thought they start/reach destinations on time....and to cover that delay...they give slack between NLR-GDR both directions...and there is no such route constraints or speed restrictions in GDR sections as much as in the BZA-DVD which is the reason why trains will ply with significantly low Speed then that of GDR section...
.
and more over its not just passenger traffic but...
more...
.
and more over its not just passenger traffic but...
more...
did i said DVD is in SCR ? i said BZA-DVD section ...not DVD station
RJY is built in such a way that no body can do anything. From KVR - Kadiyam speed restriction is there. If Freight is ahead of the train, then its always a problem, train will stop at KYM. Also, BZA - VSKP is busy with freights. I guess, Auto Signalling will clear this problem, then trains/freights might go back to back, not sure though whether its possible or not.
The train should start at 6.00 pm at TIRUPATY and reach at 6.00 am at VSKP. In the reverse direction also the same timings. SUPER HIT ...SUPER HIT.