Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Sapt Kranti Express: Ruling the tracks with EMD Power - Keshav Singh

Search Forum
<<prev entry    next entry>>
Blog Entry# 1974175
Posted: Aug 27 2016 (18:38)

10 Responses
Last Response: Aug 28 2016 (14:53)
Rail News
29114 views
1

Other News
SR/Southern
Aug 27 2016 (18:17)   Train schedules at Central changed
 

Jayashree^   51390 news posts
Entry# 1974175   News Entry# 278317         Tags   Past Edits
CHENNAI: Passenger trains from and to Chennai Central will be rerouted through Perambur or Chennai Beach from September 6 to October 7.
Train...

5 Posts

23530 views
0

Aug 27 2016 (21:06)
Sonuhasan~
Sonuhasan~   338 blog posts
Re# 1974175-6              
Yes
Translate to English
Translate to Hindi

23321 views
1

Aug 27 2016 (21:09)
12YEARSINIRI^~   11515 blog posts
Re# 1974175-7              
5 th and 6th line works
Translate to English
Translate to Hindi

45323 views
0

Aug 28 2016 (10:36)
RFIR~
RFIR~   6835 blog posts
Re# 1974175-8              
Its ok...relax my friend. I had uploaded two separate posts.
No need to reply to every post that i put.
Translate to English
Translate to Hindi

46622 views
0

Aug 28 2016 (10:38)
guest   40346 blog posts
Re# 1974175-9              
Dont post same topic in diff blog posts use only one
Translate to English
Translate to Hindi

45317 views
0

Aug 28 2016 (14:53)
RFIR~
RFIR~   6835 blog posts
Re# 1974175-10              
The SR in its twitter page has given a good explanation & background for the same.The fifth and sixth lines are needed as movement of trains in the Moore Market Complex-Basin Bridge corridor is already constrained as both EMU trains as well as long distance express trains have to share the existing track.
The fifth and sixth lines will provide a separate corridor for EMU trains towards Arakkonam to ensure uninterrupted movement of suburban trains thereby reducing commuting time for passengers besides enhancing the sectional capacity.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy