Full Site Search  
Wed Aug 23, 2017 11:56:08 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

<<prev entry    next entry>>
Blog Entry# 1976333  
Posted: Aug 30 2016 (14:57)

2 Responses
Last Response: Aug 30 2016 (14:59)
  
Rail News
0 Followers
823 views
Other News
Aug 30 2016 (14:54)   Power Grid to electrify 1,000 km of rail tracks on pilot basis
 

Jayashree   37362 news posts
Entry# 1976333   News Entry# 278538         Tags   Past Edits
Power Ministry is looking to engage Power Grid Corp (PGCIL) to electrify 1,000 km of rail tracks on a pilot basis, as part of plans to energise 35,000 km of unelectrified lines.
The electrification project will help the government cut down crude imports and also ensure faster movement of trains on these tracks.
In the first phase, the electrification project will cover 16,000 km of busy tracks out of 35,000 km of unelectrified lines in the country. The electrification of tracks will help railways save around Rs 8,000 crore annually.
Indian
...
more...
railways consumes around 2.8 billion litres of diesel annually, costing around Rs 18,000 crore -- nearly 18 per cent of its working expenses.
"The Railway Ministry has started work on it (rail electrification). In a small pilot, we will involve PGCIL because we have not done this in the past," Power Minister Piyush Goyal told PTI.
Goyal further said, "We are discussing that first PGCIL will do a pilot of 1,000 km to assess its capability. Railways has assessed that it is viable for doing electrification of around 16,000 km of tracks."
However, the diesel consumption on remaining 19,000 km of unelectrified tracks is not much. Thus the investment on electrification of these tracks will not offset savings.
Earlier in March this year, Goyal had announced the government's plans to electrify 35,000 km tracks by state-owned power companies over a period of three years.
He further said, "We are going to stop production of diesel locomotives that is the decision which Suresh ji (Railway Minister Suresh Prabhu) will take quickly. I hope that it (electrification) would be done in the next three years. I want to do it in three years."
The minister had also said, "Rs 1 crore per km is the current cost of rail electrification. If we do it in three years, the cost will come down to half. But it cannot be less than 30-35 per cent. The Power Ministry will spend entire money."
According to the Minister, the electrification of entire rail tracks in the country will lead to power consumption going up by 7 billion units.
Railways, which procures power from distribution companies, spends about Rs 12,300 crore a year to purchase 17.5 billion units of electricity.
On the power front, railways is planning to save Rs 3,000 crore in sourcing electricity by proposing to procure power through competitive bidding.
Besides, the Railways has also rolled out plans to set up 1,000 MW solar power plants at railway lands and rooftops of railway buildings with support from the Ministry of New and Renewable Energy over the next five years.

  
1401 views
Aug 30 2016 (14:57)
Pained to know Boeing 777 landcrashed~   23275 blog posts   21101 correct pred (68% accurate)
Re# 1976333-1            Tags   Past Edits
Jis tezi se electrification ki taiyyari ho rahi h lagta h savi diesel locos Bangladesh bhej diye jayenge...

  
1473 views
Aug 30 2016 (14:59)
Proud atheist~   4506 blog posts   37 correct pred (63% accurate)
Re# 1976333-2            Tags   Past Edits
Electrification to bahut tezi se kar rahe hain par itni hi tezi se Madhepura eloco factory ko bhi banana chahiye warna eloco ki aur bhi zyada shortage ho jaegi
Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.