Search Forum
Blog Entry# 1976995
Posted: Aug 31 2016 (11:54)
3 Responses
Last Response: Aug 31 2016 (12:10)
3 Responses
Last Response: Aug 31 2016 (12:10)
Vijayawada Jn also operated with more congestion.Anew line TENALI to Gudivada with electrification have to be constructed to relieve congestion of Vijayawada jn.
2 Public Posts - Wed Aug 31, 2016
The congestion problem is more in BZA-VSKP sector than BZA-MAS and north-bound traffic at BZA is managed well due to PF arrangements. And BZA-GDR 3rd line has been commissioned, which can further improve things.
Your proposal is also useful, once the proposed port corridor in AP is sanctioned. A connection between MTM-BPT bypassing BZA is part of the plan.
Your proposal is also useful, once the proposed port corridor in AP is sanctioned. A connection between MTM-BPT bypassing BZA is part of the plan.