Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

RailFanning is an art-form; RailFans are the paints - Ayush Kumar Singh

Search Forum
<<prev entry    next entry>>
Blog Entry# 2024891
Posted: Oct 15 2016 (22:10)

7 Responses
Last Response: Oct 18 2016 (16:53)
General Travel
3593 views
1

Oct 15 2016 (22:10)  
 
MSRINIVASANME~
MSRINIVASANME~   4761 blog posts
Entry# 2024891              
Travelled in yesterday ,14.10.16 Pune departure Chennai mail at 18.10 in S5 coach to Chennai in Mumbai to Chennai Central Express and arrived Chennai Central at 16.40 ,just ten minutes delay.
Maintenance ::
The cleanliness and watering are good.
The coach is good old one operated between Mumbai Metro to Chennai Metro via Pune Mini Metro.
...
more...
Minimum Facilities :::
This S5 coach 3rd bay does not have dining tray.
No cell charging point provided in all these bays.
No plastic wired water bottle holder in this bsy of berths 25 to 32 .
Our Indian Railway should be provided at least water bottle holder in wired plastic (the cheapest arrangement) or mettalic bottle holder to all the Sleeper class passengers individually in their berth.
Train operation:;;
Mumbai to Chennai express is operated as Fast Passenger in Maharashtra and Andhra Pradesh with slow speed and more number of stoppages.
This train operated up to Arakkonam in time and departure at Arakkonam at 14.20 today,15.10.16.
This train has no stoppages at Thiruvallur ,but Stopped for 10 minutes in the Thiruvallur western outer signal.Moreover this train stopped at Basin Bridge western outer signal and stopped in the Basin Bridge station around 40 minutes and started at 16.30 and arrived Central station 10 minutes late in No 1 platform.
Arakkonam to Chennai Central takes 2 hour 20 minutes to reach the extreme northern side of the number 1 platform.Platform 1 to 5 may be utilized exclusively for the Northern trains via Gudur .Platforms 6 and above shall be utilized for Arakkonam side trains . Since this train traditionally allotted to the extrem. Northern platform number 1 ,it have to be held up at Basin Bridge more than 40 minutes to cross all the Central station platform from Southern end to the Extreme Northern end.
From Arakkonam to Chennai Central travel 2Expresses and 3 sub- urban passengers over taken this train.
SR shall be received this Express in the southern side of the platforms close to Moore Market Complex ( platforms number 6 and above.
My suggestion for this express train operation between 2 Metros of Arabic coast to Bay of Bengal .
This train have to be operated as Super Fast and arrive Chennai central around 4 hours before ie is 12.30 . Otherwise in the present Express form at least 2 hours before arrival time of Chennai around 14.30.
Pune to Sholapur Hutama ordinary express started at Pune at 18.00 daily and arrived Solapur at 22.00.But Mumbai to Chennai Central express started at Pune at 18.10 and reached Sholapur 23.15 ( additional travelling time of 1 hour and 5 minutes of same category of express with same stoppages for both of distance 263 km only ).
So as this express can be saved at least 2 hour running time and arrived Chennai Central around 14.30.
Hope that our CR,SCR and SR shall be operated this train with lesser travelling time of 2 hours as Expresses and Saved 4 hours of running time as SUPER FAST .and received in platforms in the Southern side close to Moore Market side ( platform no 6 and above ),so as this train can not be blocked all the Central station platforms.

Translate to English
Translate to Hindi

2 Posts

1414 views
0

Oct 16 2016 (06:54)
MSRINIVASANME~   4761 blog posts
Re# 2024891-3              
But dark colours are not marked for this Hutama S/ F express in the Western zone time table wef 1.10.2016.
Translate to English
Translate to Hindi

1385 views
0

Oct 16 2016 (16:51)
12YEARSINIRI^~   11515 blog posts
Re# 2024891-4              
You are saying about Mumbai Chennai express not Mumbai Chennai mail. Edit the post
Translate to English
Translate to Hindi

1977 views
2

Oct 16 2016 (17:10)
RailFanSBC~   393 blog posts
Re# 2024891-5              
Thirupathy Perumale Chennaikku trainla vanthaalun BBQ la ninnuthaan varanam
Translate to English
Translate to Hindi

1217 views
0

Oct 18 2016 (14:01)
MSRINIVASANME~   4761 blog posts
Re# 2024891-6              
Yes sir.sorry.Express only
Translate to English
Translate to Hindi

1649 views
0

Oct 18 2016 (16:53)
MSRINIVASANME~   4761 blog posts
Re# 2024891-7              
After execution of 5 th and 6 th Railway line between Chennai Central to Basin Bridge informed that Arakkonam bound trains are immensely benefitted .Is it wrong or right ?Moore Market complex also provided with 24 coach platforms so as to discharge express passengers .
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy