Search Forum
Blog Entry# 2027014
Posted: Oct 17 2016 (17:21)
3 Responses
Last Response: Oct 19 2016 (14:47)
3 Responses
Last Response: Oct 19 2016 (14:47)
Commentary/Human Interest
SR/Southern
Rang De Basanti^ 138872 news posts
Work up to theNetravathibridge hasalready been executed
The...
The...
read more... Track electrification up to Mangaluru by Dec.
Even in the existing stretch at least till calicut, there seems to be not much of difference in the time of trains despite electrification.
The benefit will only come if there is some speed up and running time reduction in this stretch and also introduction of MEMU services to benefit local passengers.
The benefit will only come if there is some speed up and running time reduction in this stretch and also introduction of MEMU services to benefit local passengers.
Practically speed is dependent on the track conditions (esp. Max Permissible Speed & speed restrictions) and electrification has little impact on speed (except suburban trains). However Journalists never miss opportunity to report that the speed of trains shall appreciably increase after electrification.