Route: 18 MS/Chennai Egmore - CGL/Chengalpattu Junction: Triple Electric-Line
2 Posts
Oh, I didn't know about the GC part. I traveled to CGL in Mid-July, and by that time, practically all of the MG track was completely lifted, except for a short stretch under the flyover at Vandalur. and there was no construction activity of any kind all along the route. I thought that was the end of 3 line operations on this route!
MG removed for GC purpose. during MG times it was double MG and single BG before that 3 MG. once CRS sanctioned we can update as triple line as there is no option for construction of third line, so till that let it be double electric line. kindly make sure people dont mess with these without proper news source
If you do have the privileges to modify the atlas, could you please modify to show the construction of doubling between Hotgi and Kudgi?