Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

ट्रेनों का सफर, ज़िन्दगी का सफर, रेलफैन दोनों में माहिर

Search Forum
<<prev entry    next entry>>
Blog Entry# 2039328
Posted: Oct 27 2016 (21:44)

18 Responses
Last Response: Oct 28 2016 (18:45)
General Travel
3810 views
12

★★
Oct 27 2016 (21:44)   ALJN/Aligarh Junction (7 PFs)
 
K.K.^~
K.K.^~   160252 blog posts
Entry# 2039328            Tags   Past Edits
Status on ALJN PF increase work and new modifications in pf numbers of trains...
->A line which was terminal type near to pf3 has been removed and pf3/4 has been extended in both directions i.e. CNB and NDLS side.
->The main platform for CNB bound trains was PF2 but now it is PF3.
->The main platform for NDLS bound trains was PF3 but now
...
more...
it is PF4.
->EMU,MEMU,BE-ALJN PASS PF changed from PF4 to PF2.
->75kmph TSR has been issued on CNB line.
->100kmph PSR remains the same on NDLS line.
->Loop line for CNB bound is PF2 and Loop line for NDLS bound is PF5.
->Beside the line of PF4 there is a line for goods then PF5 and then PF6.
->PF7 work is in progress while PF5&6 are functional.
-------------------------------------------------- -------------------------------------------------- -------
Some spottings-
# Loco change for BE pass occured from PF3 line.
# Simultaneously two goods train departed towards NDLS.
# NCR track work car were placed at PF7.
# More lights have been placed on PF3&4 making it more feasible for passengers.
# LED lights on PF5&6.
# Smooth functioning of trains on both sides.

Translate to English
Translate to Hindi

13 Posts

1276 views
0

Oct 28 2016 (18:19)
K.K.^~
K.K.^~   160252 blog posts
Re# 2039328-14              
yes bhai....i was also eager to give update on this as i was in jaipur these days....
Translate to English
Translate to Hindi

1197 views
0

Oct 28 2016 (18:19)
Abhi   290 blog posts
Re# 2039328-15              
Now Pf 3&4 of aljn is very dangerous for pax coz pf 3 is down main line and pf 4 is up main line both side and there is curve on pf4 passengers have to be very care full pax should use foot over bridge coz if they try to cross track of pf 4 and thru train will came and there life will be in danger
Translate to English
Translate to Hindi

1476 views
0

Oct 28 2016 (18:19)
K.K.^~
K.K.^~   160252 blog posts
Re# 2039328-16              
Thanks bhai...
Translate to English
Translate to Hindi

1236 views
0

Oct 28 2016 (18:25)
Abhi   290 blog posts
Re# 2039328-17              
One more news working of 3rd line started from dar(dadri) home to intermediate starter now the bottle neck problem will solve and all train will save it 30min and no halt for those train who used to stop to passing other thru train and also time save for emu/memu if this work completed
Translate to English
Translate to Hindi

1277 views
0

Oct 28 2016 (18:45)
K.K.^~
K.K.^~   160252 blog posts
Re# 2039328-18              
yes bhai totally agree with you...
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy