Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Everyone knows if a train is running late, ONLY RailFans know WHY it is late

Search Forum
<<prev entry    next entry>>
Blog Entry# 2048015
Posted: Nov 04 2016 (15:39)

No Responses Yet
General Travel
2829 views
2

Nov 04 2016 (15:39)   STLI/Sithouli (2 PFs)
________~
________~   731 blog posts
Entry# 2048015            Tags  
New Style of Trasporting a Car. Presenting an WAG 5 as power of BCACBM rake crossing SITHOULI STATION (GWALIOR N.C.R).
3rd Generation Carriers :
The Indian Railways & Maruti Suzuki ( A leading Automobile manufacturer in India ) recently rolled off a high-capacity railway wagons (technically called BCACBM) for Transporting newly manufactured cars from the factory to various Cities since early 2014.
Named as
...
more...
‘Flexi deck auto-wagon rake’ is the first of its kind in Indian Railways , it brings the advantages of higher capacity, flexibility & faster speed to the rail transportation of cars.
The ‘Flexi deck' rake has 20% additional capacity (318 cars) as compared to the current Second Generation twin-decker coaches (265 cars). The new rake, with its height adjustable middle-deck, is highly flexible and can transport vehicles of multiple dimensions.
The new rake can move at speed of upto 95 kmph as compared to 65 kmph -75 kmph of the existing 1st & 2nd Generation rakes.
These Flexi deck rake consisting of 27 wagons frequently come to Nidavanda, a small town near Bangalore where a loading Terminal has been setup. These wagons from Gurgaon ( Haryana) carrying a mixed load of Maruti cars including Swift, Dzire, Alto, Wagon R and Omni takes upto 5 days to reach Bangalore.
The new rake, with its height adjustable middle-deck, is highly flexible and can transport vehicles of multiple dimensions. The new rake can move at speed of up to 95 km per hour as compared to 65 km per hour of the existing rakes. It can travel between Gurgaon and Bangalore in five days as compared to seven days by road transportation. Transporting cars by new flexi deck auto-wagon rake will lead to reduction in carbon emission making it more environment friendly.
Maruti Suzuki is India's first automobile company to procure flexi deck auto-wagon rakes. It has initially procured three such rakes of 27 wagons each. These rakes will be primarily deployed in the high-volume west and south India destinations.
In the long term, the company will dispatch cars through railways to several destinations like Nagpur, Siliguri, Mumbai, Pune, Mundra, Kolkata etc. Maruti Suzuki will order more rakes to meet its growing transportation requirement.
#INDIANRAILWAYS
#TRAINS
#RAILROAD

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy