Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Gatimaan Express: Raftaar meri Pehchaan - Sajid Akhtar

Search Forum
<<prev entry    next entry>>
Blog Entry# 2054077
Posted: Nov 09 2016 (19:24)

2 Responses
Last Response: Nov 09 2016 (21:00)
Rail News
3415 views
0

Other News
Nov 09 2016 (17:31)   Former Board Member ‘signals’ pitfalls for running Highspeed Trains

Brahman^~   127 news posts
Entry# 2054077   News Entry# 285243         Tags   Past Edits
Mumbai: The Railways is upbeat about running high-speed trains like the Spanish Talgo and Rajdhani between Mumbai and Delhi at a speed of 160 kilometres per...

4041 views
1

Nov 09 2016 (19:24)
I.R.needrejuvenation~
I.R.needrejuvenation~   1946 blog posts
Re# 2054077-1              
Running faster 160kmphand above on the present Indian tracks say NDLS-KOTA-BRC-BCT is basically impractical today because
(1) the track is super saturated saturated, and few 160kmph trains on the route shall badly affect the running of other trains SF/Passenger/Freight.
(2) Due to a large number of curves (whopping 495 as reported i.i. one curve every 2.7km), the train shall hardly touch its top speed for much less than 50% of its run
(3)
...
more...
Higher speed operation shall entail frequent acceleration, deceleration of the HST and much wear and tear to track as well as train bogies. It is not good for safe operation of train. Also much improvement in journey time and avg speed will not be possible.
Track alignment of majority of IR routes was fixed over a century ago, when speed (160kmph+) of operations was not an important consideration.
Best option is to go for straighter track alignment for the large scale tripling of main lines going on and planned for future. A few 160kmph+ trains that are planned on the route can be operated on this straight track so that top speed is achieved for almost all the time during the run, and a non stop train may give an avg speed of around 120-130kmph between the destinations. The straighter track shall permit further upgradation of speed to say 200 kmph or more in future.
Other option is to upgrade the tracks in a span of about 3 years and by that time DFC shall be ready to take on all the freight trains of the route.That will be right time to operate 160kmph train without straining the network and disturbing the existing traffic, rather than making hurry when IR is financially much stressed.

Translate to English
Translate to Hindi

4118 views
0

Nov 09 2016 (21:00)
KishorWhoAJE2here~
KishorWhoAJE2here~   8564 blog posts
Re# 2054077-2              
Are public money for wasting ?
If they are putting cart before horse, how can whole country run...
"Mr Prasad has said that to run high-speed trains, signalling needs to be upgraded. There are 495 speed-killing curves on the tracks between the Mumbai and Delhi section."
If signalling is not upgraded the High-speed trains are dangerous....
What
...
more...
a Hilarious or Stupid scenario ....
Buying Trains before Signalling is upgraded ...
Is this govt wise or what ?

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy