Once again speed showdown by the ECR's Sampoorna Kranti Express.
Overtaken SG 2nd consecutive day .
Overtaken Poorva At Aljn (as usual).
🎇 Avg till HNG - 93 kmph Post CNB🎇
Overtaken SG 2nd consecutive day .
Overtaken Poorva At Aljn (as usual).
🎇 Avg till HNG - 93 kmph Post CNB🎇
31 Posts
Its not like that sir ..
Actually TN gets the outmost priority in every zone due to its avg speed of 67 kmph ..
So if ur train is late then it will be overtaken by TN because if made to run behind Goa then its delay will increase ..
And then at destination instead of one train they will be having 2 trains...
more...
Actually TN gets the outmost priority in every zone due to its avg speed of 67 kmph ..
So if ur train is late then it will be overtaken by TN because if made to run behind Goa then its delay will increase ..
And then at destination instead of one train they will be having 2 trains...
more...
All 3 trains already late from JHS ie. GT, Goa and TN but mostly only Goa gets trolled, 12779 has good slack between MTJ to NZM even covered 45 minutes delay at MTJ on my trip to NZM.
Also if you are filing RTI there is another case of such unscheduled overtakes happening in SCR which I know ie. in VSKP BZA sector where a SF 12717 is overtaken on unscheduled basis by 18047 a M/E and sometimes also by 18463 which is a M/E too.
You can go through some...
more...
Also if you are filing RTI there is another case of such unscheduled overtakes happening in SCR which I know ie. in VSKP BZA sector where a SF 12717 is overtaken on unscheduled basis by 18047 a M/E and sometimes also by 18463 which is a M/E too.
You can go through some...
more...
Thank u sir for providing me thia explanation..
Actually i know very little about that section ..as they are less travelled by me..
Bt one thing is sure ..it shld nt happen ..
Actually i know very little about that section ..as they are less travelled by me..
Bt one thing is sure ..it shld nt happen ..
Your point is for current scenario.
But if one LHB SF (permitted 130 MPS) can cover CNB-NDLS within 5 Hrs than why not other.Schedule need to be revised as per speed. So many train rached station RT or Before but these train stop at station till priority train not departed. Its Actually caused delayed.
Train 22412 depart from NDLS at 15:50
Train 12878...
more...
But if one LHB SF (permitted 130 MPS) can cover CNB-NDLS within 5 Hrs than why not other.Schedule need to be revised as per speed. So many train rached station RT or Before but these train stop at station till priority train not departed. Its Actually caused delayed.
Train 22412 depart from NDLS at 15:50
Train 12878...
more...
It is usually ( I say 'usually', because in some cases it might be due to more political reasons, or the priority assigned to a zone for a train) not discrimination, but more about operational feasibility. I had learned a few things about his from a team at my college that worked on signalling system for Madras suburban network. They used to interact regularly with controllers during their work and had a good insight into how it works.
For trains that pass through multiple zones or divisions, usually the crew links, loco links, working time table, overtakes, crossings etc, are planned much in advance. So, when a train is running late, all the zones...