Search Forum
Blog Entry# 210240
Posted: Jul 26 2011 (07:53)
5 Responses
Last Response: Jul 26 2011 (21:33)
5 Responses
Last Response: Jul 26 2011 (21:33)
1 Public Posts - Tue Jul 26, 2011
The running time of trains bound for southern destinations from Chennai is expected to come down, with Southern Railway planning to introduce locomotives with higher hauling power, Chief Mechanical Engineer V. Carmelus said on Tuesday.
A Rs.10-crore project for the maintenance of high-speed locomotives such as WDP4 and WDG4 is moving towards completion at the Golden Rock Workshop in Tiruchi. The broad gauge doubling works between Chennai and Madurai, nearing end, would facilitate operation of trains at a much higher speed as it would eliminate unscheduled stoppages for crossings.
“As of now, the...
more...
A Rs.10-crore project for the maintenance of high-speed locomotives such as WDP4 and WDG4 is moving towards completion at the Golden Rock Workshop in Tiruchi. The broad gauge doubling works between Chennai and Madurai, nearing end, would facilitate operation of trains at a much higher speed as it would eliminate unscheduled stoppages for crossings.
“As of now, the...
more...
3 Public Posts - Tue Jul 26, 2011