Feb 04 2017 (15:08) DDL/Dhandari Kalan (3 PFs)
IndianTrainFanonTwitter~
IndianTrainFanonTwitter~ 10340 blog postsAccording to you what will be the time of launching for the Dedicated Eastern Freight Corridor (EDFC) which is a Flagship Project for the Narendra Modi Government just like WDFC or ADI-BCT Route Bullet Train Corridor ?
NO vote
On time (Oct. 2019)
6%
2
Before time (March. 2019)
9%
3
Will skip the set deadline (probably before the 2019 Indian General Elections)
84%
27
Add your comment through blog
0%
0
6 Public Posts - Sat Feb 04, 2017
4 Public Posts - Sun Feb 05, 2017
1 Public Posts - Wed Jan 10, 2018
* DFC is a very old concept world wide, many DFCs were operational in many countries. Due to the industrial boom, IR was getting bumper incremental loading, IR decided to go for construction of DFCs in 2006 to meet the future loadings.
* Minimum of 4-5 yrs are required for construction of a corridor, announcing DFC in 2006 and planning to operate trains in 2 yrs is impractical. Practically the announcement mostly remained on papers and actual work was very slow.
* During the tenure of Mr Prabhu, contract awarding & construction...
more...
* Minimum of 4-5 yrs are required for construction of a corridor, announcing DFC in 2006 and planning to operate trains in 2 yrs is impractical. Practically the announcement mostly remained on papers and actual work was very slow.
* During the tenure of Mr Prabhu, contract awarding & construction...
more...