Search Forum
Blog Entry# 2181213
Posted: Feb 28 2017 (16:25)
6 Responses
Last Response: Mar 31 2017 (12:56)
6 Responses
Last Response: Mar 31 2017 (12:56)
#indorenews
Speed trial between Tihi-Rau (single line) and Rau-Indore (second line). After almost a year, the second line between Rau and Indore is ready and CRS Inspection Train ran @110 for the speed trial. With this there will be two lines avaialble from Indore to Rau Jn. and then 2 single lines towards Mhow and Tihi (Pithampur) respectively. In Tihi, ConCor has constructed a new container depot which will have goods and container trains from Tihi to Ratlam.
Enjoy the video..
Speed trial between Tihi-Rau (single line) and Rau-Indore (second line). After almost a year, the second line between Rau and Indore is ready and CRS Inspection Train ran @110 for the speed trial. With this there will be two lines avaialble from Indore to Rau Jn. and then 2 single lines towards Mhow and Tihi (Pithampur) respectively. In Tihi, ConCor has constructed a new container depot which will have goods and container trains from Tihi to Ratlam.
Enjoy the video..
1 Posts
dear #admin #moderator #atlasmonitor
please update it on map.
as now it is double diesel line with electrification is in progress.
so please update it to dobule from indore to rau.
TIA...
more...
please update it on map.
as now it is double diesel line with electrification is in progress.
so please update it to dobule from indore to rau.
TIA...
more...
Nahi.. Filhaal to aisi koi planning nahi hai... Mhow-Khandwa chalu hone ke baad shayad zarurat padne par doubling ho sakti hai... Abhi to sirf DEMU aur 1-2 passengers hi Mhow se chalengi.. Haan Rau-Indore ke bich zarur 2 lines ho gayi hain...
Yes Indore to Rau double line and Rau to INdore single line is fully electrified now.. Trials are underway and a CRS inspection is scheduled for 31st March