Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

TATA Steel Express - Second Sitting sasta bhi, sabse achha bhi - Ravi Raj

Search Forum
<<prev entry    next entry>>
Blog Entry# 2246820
Posted: Apr 23 2017 (10:16)

7 Responses
Last Response: Apr 23 2017 (11:47)
Rail Fanning
38537 views
18

★★★
Apr 23 2017 (10:16)   15128/Kashi Vishwanath Express (PT) | GZB/Ghaziabad Junction (6 PFs) | TKD/WDP-4D/40252
brucewayne~
brucewayne~   2901 blog posts
Entry# 2246820            Tags   Past Edits
*****Varanasi-Kharagpur Trip****turned out to be****Varanasi-Ghazipur Trip******
___Last Chapter___
Includes Various Random Pics which were left for the upload.
1 & 2. TKD 4D hauling Legendary Kashi V. Express arriving PF-2 of Ghaziabad Jn.
3,4
...
more...
& 5. The Legendary Kashi V. Express standing on PF-2 of Ghazibad Jn.
6. Almost completed electrification work between Aunrihar Jn. and Ghazipur City. Pic taken from road crossing at Saheri. The work over left is at station and pit lines only. Rest completed.
7. 3 in 1 frame at Ghazipur City. Ballia-Varanasi Passanger on PF-1, Ghazipur-Varanasi DEMU via Jaunpur on Main Line, Lucknow-Chhapra Express which arrived bang on time at PF-2.
8 & 9. Lucknow-Chhapra Express hauled by Gonda Smoking Hunk waiting for departure signal at PF-2 Ghazipur City.
10. Incredible India coach with #TB the Freeholder of Ghazipur "SuhaldevSuperfast" at PF-1.
11. A night scene at Ghazipur City with LED paletes still work under process. (Final touch before inaugration).
Pic Courtesy: Younger Bro. (for pic 7,8,9 &10)
Rest all clicked by me. Still some are remaining for upload. will upload it as random when free.
till than do enjoy this blog. and do not forget to rate if you liked it.... :) :D
copyright Mr. Wayne

Translate to English
Translate to Hindi

5 Posts

20980 views
0

Apr 23 2017 (11:20)
TouristerDivyanshu^~
TouristerDivyanshu^~   172564 blog posts
Re# 2246820-6              
Arj- bsb electrification ka kya status h
Translate to English
Translate to Hindi

20859 views
1

Apr 23 2017 (11:32)
brucewayne~
brucewayne~   2901 blog posts
Re# 2246820-7              
ARJ to SRNT poles are placed...wiring remaining... as doubling is completed... while placement of poles is being done between BCY-SRNT on a slow pace... with no sign of doubling between Sarnath-Varanasi City. as observed. and from Varansi City to Varansi Jn. no sign of doubling as well as electrification. The third line which underpasses Varuna Brigde is Single BG.
Translate to English
Translate to Hindi

20907 views
1

Apr 23 2017 (11:35)
TouristerDivyanshu^~
TouristerDivyanshu^~   172564 blog posts
Re# 2246820-8              
Bsb to srnt will take some times uske lund block Lena padega NER Ko, baaki srnt to get electrification is diwaali to ho Jana chahiye, gct to Ballia ka kya haal h?
Translate to English
Translate to Hindi

21137 views
0

Apr 23 2017 (11:35)
TouristerDivyanshu^~
TouristerDivyanshu^~   172564 blog posts
Re# 2246820-9              
Aur gct to bui doubling ka??
Translate to English
Translate to Hindi

20668 views
1

Apr 23 2017 (11:47)
brucewayne~
brucewayne~   2901 blog posts
Re# 2246820-10              
down side kami koi info nai h... may be under process h shayad electrification.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy