Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

No Alcohol No Drugs - the only addiction is Railfanning, to escape the negativity of the world. - Keshav Singh

Search Forum
<<prev entry    next entry>>
Blog Entry# 2335081
Posted: Jun 28 2017 (11:37)

8 Responses
Last Response: Aug 16 2017 (13:33)
General Travel
737544 views
21

★★★
Jun 28 2017 (11:37)   BWN/Barddhaman Junction (8 PFs)
Shoubhik~
Shoubhik~   9299 blog posts
Entry# 2335081            Tags   Past Edits
STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN

•> Between BANDEL and ADISAPTAGRAM - No work has been done
•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on
•>
...
more...
Between TALANDU and KHANYAN - Poles have been erected but no track has been laid
•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line
•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground is going on for the rest of the portion between these two stations.
•> Between BAGILA and MEMARI - Work has been hindered after Bagila due to a small river, a bridge is getting constructed on this river, no sign of Tripling is there just before and after Memari
•> Between MEMARI and PALSIT - Only fencing and levelling of ground at some places has been done but nowhere track has been laid
•> RASULPUR and PALSIT - No sign of Tripling can be seen in these two stations
•> NIMO - Work has recently started in this station
•> At some stations like BAINCHI, one more platform is under construction

Pic 1 to 3 - from adisaptagram to talandu
Pic 4 to 7 - from talandu to khanyan
Pic 8 to 11 - entering khanyan
Pic 12 to 14 - remodelling of station at Khanyan
Pic 15 to 18 - tripling along with electrification done after Khanyan
Pic 19 to 22 - remodelling of station at Simlagarh
Pic 23 - remodelling of station at Bainchigram
Pic 24 - entering Bainchi
Pic 25, 26 - new platform getting constructed at Bainchi
Pic 27 - after Bainchi
Pic 28 to 30 - after Debipur, electrification is done for a certain distance but no track has been laid
Pic 31,32 - levelling of ground going on between Debipur and Bagila
Pic 33, 34 - a bridge getting constructed after Bagila
Pic 35 - between Bagila and Memari
Pic 36 to 38 - No work has been done (except fencing aya some places) just before and after Memari
Pic 39 - Work has just started at NIMO halt
Pic 40 to 43 - fencing and levelling of ground going on between Nimo and Rasulpur
Pic 44, 45- no sign of tripling at Rasulpur
Pic 46, 47 - levelling of ground going on between Rasulpur and Palsit
Pic 48 - no sign of work at Palsit
Pic 49 to 51 - a view of HWH BWN chord line from HWH BWN main line

#SC17

Translate to English
Translate to Hindi

3 Public Posts - Wed Jun 28, 2017

173897 views
1

Jun 28 2017 (18:49)
Brahman^~
Brahman^~   10903 blog posts
Re# 2335081-5               Past Edits
Palsit niche diye jayega aache
Seta railway er jono profitable karon sekhne kono bridge toyri korte hobe na money er songe time o bachbe
Ebar railway ki kore dekhte hobe
Translate to English
Translate to Hindi

2 Public Posts - Wed Jun 28, 2017

2 Public Posts - Wed Aug 16, 2017
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy