Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

बाज़🦅 आ रहा है ~ सिलीगुड़ी WDP-4 20000 Series - Niraj Kumar

Search Forum
<<prev entry    next entry>>
Blog Entry# 2339236
Posted: Jul 02 2017 (00:54)

7 Responses
Last Response: Jul 09 2017 (18:26)
General Travel
7403 views
4

Jul 02 2017 (00:54)   12357/Durgiana Express (PT)
guest   848 blog posts
Entry# 2339236            Tags   Past Edits
Such a worst controlling by NR as usual superb run in gc but once it enter NR specially Varanasi despite double electric line unscheduled halted at kashi then in Varanasi double line ahead towards SLN it was halted for 1 hour as per me the worst section in Indian railway is bsb-lko-moradabad-sre too much frustrating totally nightmare.the only Good route is to travel north India from eastern side is mgs ald cnb ndls section that too via ald division train or Raj gang of traveling other than these category train you may miss your target,your plan,schedule etc
Translate to English
Translate to Hindi

2 Posts

2479 views
2

Jul 03 2017 (13:30)
Arifwap
Arifwap   17601 blog posts
Re# 2339236-3              
This train alway get high priority between Bsb-lko ,, prblm is lko nd bsb outer ,, jo bhi delay cover hia rehta hai wo outer pe waste ho jata hai
Translate to English
Translate to Hindi

2453 views
0

Jul 08 2017 (12:18)
IndianTrainFanonTwitter~
IndianTrainFanonTwitter~   10340 blog posts
Re# 2339236-4              
I had read in a news on IRI that NR is planning to lay bypass tracks or may be connecting new tracks from Utretia Jn to Alamnagar via Transport Nagar so that burden on LKO is reduced, especially for Amritsar/Jammu/Dehradun bound trains. Let's see what happens next. Any latest development on the BBS-SLN-LKO Route? :)
Translate to English
Translate to Hindi

2372 views
1

Jul 09 2017 (18:00)
RailcumAviationfreak^~   1862 blog posts
Re# 2339236-5              
Even during my journey in 12381 , it was stopped at Kashi for some 10 minutes for crossing with Doon Exp & Brka pass .
Translate to English
Translate to Hindi

2335 views
1

Jul 09 2017 (18:08)
NAWABShatabdi~
NAWABShatabdi~   7642 blog posts
Re# 2339236-6              
By October whole LKO-SLN-BSB route would get doubled also NR is currently having a bypass line from Uthretia to Alamnagar which is single and electrified but now they are planning to get it doubled and the whole freight traffic will be through that line(No passenger train will be through that line)
Translate to English
Translate to Hindi

2159 views
1

Jul 09 2017 (18:26)
Ankit^~
Ankit^~   9754 blog posts
Re# 2339236-7              
That route is worst in terms of train punctuality.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy