Search Forum
Blog Entry# 2353532
Posted: Jul 15 2017 (16:53)
7 Responses
Last Response: Jul 17 2017 (13:04)
7 Responses
Last Response: Jul 17 2017 (13:04)
Viaduct on BanGanga river.
This frame will look complete with train crossing it, once SVDK-BAHL line construction is completed and commissioned.
This frame will look complete with train crossing it, once SVDK-BAHL line construction is completed and commissioned.
2 Posts
Why don't they initially make it a double line route? Anyway doubling is needed on every busy sector...
Even I thought the same. Doing doubling in such a difficult terrain will be challenging.
Both side tunnel and Road below bridge is Banganga Katra Road wich take longer route then Katra Banganga