Search Forum
Blog Entry# 2369119
Posted: Aug 02 2017 (18:22)
4 Responses
Last Response: Aug 20 2017 (19:28)
4 Responses
Last Response: Aug 20 2017 (19:28)
Aug 02 2017 (18:22) 22945/Saurashtra Mail (PT) | RJT/Rajkot Junction (7 PFs)
riz339~
riz339~ 5461 blog posts1 Public Posts - Wed Aug 02, 2017
1 Public Posts - Fri Aug 04, 2017
This action must have been taken because Saurashtra Mail runs late normally by an hour or sometimes by 1 hour 30 minutes.The train fails to keep up its SF timetable.Instead of giving accumulated slack in the end , the slack needs to be distributed equally.Has the halt at Mithapur been removed?The point to be noted is that the arrival of Rajkot is too early for the train even inspite of the known fact that Surendranagar - Rajkot is a single line section and with so many trains including freights , the train experiences many crossings within the stretch.The arrival at Rajkot should be pushed further considering this fact .Halt time should be reduced to 15 minutes which I find is suitable and I guess they have done it in the New time table.Train can be speeded up even more in Kanalus- Okha section because the only trains encountering crossing with 22945...
more...
more...
1 Public Posts - Sun Aug 20, 2017