Search Forum
Blog Entry# 2372713
Posted: Aug 06 2017 (14:48)
5 Responses
Last Response: Aug 08 2017 (23:22)
5 Responses
Last Response: Aug 08 2017 (23:22)
Aug 06 2017 (14:48) 04488xx/Anand Vihar Terminal - Gorakhpur Special Fare Festival Special | ANVT/Anand Vihar Terminal (7 PFs) | GZB/WAP-7
Piyush~
Piyush~ 7026 blog postsIs train ko IR regular kahe nahi kar raha😢 waise hi yeah Regular special bankar saal bhar chalti hi hai 😊😊 humsafar exp ka slot bhi hai regular hogi to atleast special treatment to nahi milega Agree or Not??
Nahi ye to abhi chal rahi hai 04923/24 kaafe lambe samay se kareeb 2-3 saal se 1-2month chhod kar pure saal chal rahi hai. Plus isko regular karna bhi hai to via SCC karna chahiye via CNB without reason load badhane ka koi matlab nahi hai
how about increasing frequency of GKP ANVT Humsafar (via basti)
.
and gkp anvt humsafar HS (via barhni) ki jagah se rakes se simple SF chalo via SCC. bole toh gkp - bny - gd - scc - mb - anvt.
bny se scc route pe koi train bhi nhi hai shayad.
....
more...
.
and gkp anvt humsafar HS (via barhni) ki jagah se rakes se simple SF chalo via SCC. bole toh gkp - bny - gd - scc - mb - anvt.
bny se scc route pe koi train bhi nhi hai shayad.
....
more...
This would be perfect solution but RB and politicians don't like perfect solutions. Instead of demanding RAJ they should be demanding speedup, punctuality improvement and increase in frequency of HS. Plus the loopline should be demanding a SF to Delhi instead of HS frequency and halts increase
true. RAJ milne bhi kya RLWL / PQWL milega aur kya. running RAJ via GKP for namesake ki gkp se bhi raj jaati hai. DYNAMIC FARE ne toh raj ko kharab kar dia hai.
.
We need to run existing trains with optimum utilization. eg. running all existing trains 24 coacher.
.
Humsafar...
more...
.
We need to run existing trains with optimum utilization. eg. running all existing trains 24 coacher.
.
Humsafar...
more...
HS ko both sides se speedup karke about 70+kph avg speed easily di ja sakti hai just 130mps upgradation ke baad and thus you have an unofficial RAJ. Uske bajaye ek RAJ ke extra load ki koi jarurat nahi hai