Search Forum
Blog Entry# 2379620
Posted: Aug 13 2017 (23:40)
1 Responses
Last Response: Aug 14 2017 (20:06)
1 Responses
Last Response: Aug 14 2017 (20:06)
Experienced a ride in Queen after nearly 6 months and noted the following:
(1) This train is experiencing some congestion and not able to run upto fullest potential in various places upto MGS because of the 12424 running ahead of it. It would be good if 12424 schedule is made same as past or the time gap between the two is increased by another 15 minutes.
(2) In NDLS, the train departs at 4:25 pm but arrives at platform just 15 mins before departure. It causes inconvenience to passengers a lot. But then,...
more...
(1) This train is experiencing some congestion and not able to run upto fullest potential in various places upto MGS because of the 12424 running ahead of it. It would be good if 12424 schedule is made same as past or the time gap between the two is increased by another 15 minutes.
(2) In NDLS, the train departs at 4:25 pm but arrives at platform just 15 mins before departure. It causes inconvenience to passengers a lot. But then,...
more...
Only Rajdhanis are probably allowed to cross 110 kmph in DHN-Gaya currently.