Search Forum
Blog Entry# 2390556
Posted: Aug 25 2017 (19:18)
1 Responses
Last Response: Aug 25 2017 (19:18)
1 Responses
Last Response: Aug 25 2017 (19:18)
IR Affairs
SER/South Eastern
AdittyaaSharma^~ 66904 news posts
रांची से जुड़ी दो बड़ी परियोजनाओं के लंबित होने के कारण आसपास के स्टेशनों का विकास कार्य रुका हुआ है। रांची के टाटीसिलवे और बालसिरिंग स्टेशन...
LATEST AS ON 17 AUG 17 - Since long construction of Ranchi Tata direct line is under discussion at various level and a survey also conducted for the same. But the Survey Report was not in favour of that line. So, I requested Rail Ministry to join Silli & Illoo with only around 6 km new line, bypassing Muri, which will save time of about 1 hour including time of loco reversal @ Muri.
click here
click here