Search Forum
Blog Entry# 2605908
Posted: Oct 30 2017 (20:04)
31 Responses
Last Response: Aug 31 2018 (10:18)
31 Responses
Last Response: Aug 31 2018 (10:18)
Oct 30 2017 (20:04) 12335/Godda/Bhagalpur - Mumbai LTT SF Express (PT) | JMP/Jamalpur Junction (4 PFs)
Railadventures~
Railadventures~ 2770 blog postsToday I want to tell something which as from Bhagalpur we always feel Jamalpur controllers makes huge delay to down trains comming from Kiul side just check on ntes train 07007 was just 1hr 30min delay at departure from Gaya now at Jamalpur 6hrs 32 min delay what a shit is this,a long distance train is brutally tortured in Gaya kiul section regularly why???,between Kiul to jmp also additional 30,one can say few days ago incident speed restrictions and all but when these thing were not then also 45km is not covered in 1 hrs shame on Jamalpur controlling,Garibrath is permanently trolled by Jamalpur and Vikramshila and bharamaputa are only two train having priority here,other all train comming from Delhi,Mumbai,Patna are brutally trolled comming from Kiul side in downrun,I have gone through this many times and through NTES I can experience same daily.
26 Posts
वो रूट तोह cp का ऐतेहासिक हैं रेलवे क्या rm भी कुछ नहीं करेंगे क्योंकि उनके पास 8 bg लाइन हैं और वो कंफ्यूज हो जाते हैं कि जाना किधर हैं इसलिए cp करते हैं
The actual reason for trains getting delayed yesterday in Kiul-Gaya section.
Even 13023 Hwh-Gaya express was stranded in that section yesterday.
Even 13023 Hwh-Gaya express was stranded in that section yesterday.
Gaya-Kiul is a single line section with less mps tracks. Crossing of trains often lead to increase in delay. Coal load good trains load have increased on this section.
Doubling work is being done at a good pace. Hope the situation improves in future.
Doubling work is being done at a good pace. Hope the situation improves in future.
to jab tak kaam poora nahi hota , is route ke kisi bhi train ke pax se sf charge, special fare , flexi fare , dynamic fare kuch bhi na wasoole railway wale