Search Forum
Blog Entry# 2832070
Posted: Nov 30 2017 (01:52)
3 Responses
Last Response: Nov 30 2017 (08:37)
3 Responses
Last Response: Nov 30 2017 (08:37)
As this train, along with several other trains of loop line, are temporarily using a much shorter route with no scheduled stoppages from 28.11.2017 to 18.12.2017, how is the time management being done? Is it held at an intermediate station for hours or does it reach sealdah way before time?
Still will reach way before time as the main line is electrified, throughout double, quite a few triple and some part of it quadrupled aa compared to loop line which is double/single diesel section