Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal - Train Search + Time-Tables + Avl Calendar + Forum

दूरी नही मंज़िल भारी, साथ हो जब मेट्रो हमारी - Mushfique Khalid

Search Forum
<<prev entry    next entry>>
Blog Entry# 28620
Posted: Apr 04 2010 (11:24)

11 Responses
Last Response: Apr 04 2010 (13:55)
1 Followers
8585 views
0

Apr 04 2010 (11:24)  
 
krish_railz_addicted
krish_railz_addicted   31 blog posts
Entry# 28620              
what is the meaning of "PANTO ACTION"?
Translate to English
Translate to Hindi

8 Public Posts - Sun Apr 04, 2010

39637 views
0

Apr 04 2010 (13:27)
delhimurlidhargmail.com
delhimurlidhargmail.com   3185 blog posts
Re# 28620-9              
Pnnto Action: Relates to Pantograph: that is the four armed or diamond armed levers with a flat aluminium-copper bed which touches the Overhead Wires (current lines) OHEs and collects current. This is drawn down to the transformers insider the electric locomotives and stepped down to operational voltage using thyristors (voltage converters), and then used to drive the electric motors. Panto Action means that.
It also means that when the train is approaching a section on the railway tracks where two feeders of electricity are being used, in order to prevent 'electrical collision", the panto is lowered - known as neutral section - till the engine crosses the 'neutral section - and then raises the pantograph to regain contact with the
...
more...
new feeder and start normal operations of drawing current and raising speeds..
The LPs and ALPs know the neutral sections in their working time table. If you want to see it yourself, you will find signboards mounted on the left hand side on a straight line showing a white board with signs 250 m, then 150 m, then 50 m, and then a sign which shows a perpendicular line, with an underline and again a perpendicular line Below THE UNDERLINE.. telling the LP lower pantograph.. After passing the neutral (sometimes called dead section in Railway terms), you will find three vertical lines aligned in same line on a white board again, telling the LP raise pantograph.
This also happens in sections where DC lines and AC lines converge.. Seen very normally in Mumbai area - this area is now under conversion to full AC and DC is being replaced.
Good wishes.

Translate to English
Translate to Hindi

2 Public Posts - Sun Apr 04, 2010
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy