Search Forum
Blog Entry# 2917510
Posted: Dec 22 2017 (01:37)
1 Responses
Last Response: Dec 22 2017 (01:37)
1 Responses
Last Response: Dec 22 2017 (01:37)
New/Special Trains
ECoR/East Coast
VisakhapatnamJunction^~ 90 news posts
బొబ్బిలి-సాలూరు మధ్య ప్రవేశపెట్టనున్న రైల్వే శాఖ
...
...
read more... కొత్త రైలు వస్తోంది!
English Translation
Railway branch to be set up between Bobbili and Saloru Railway Bazaar will be set up in Varanasi. Vizianagaram district: A new train will run on the Bobbili-Saloor railway line. The train will be set up by Railway Department. The train is also ready in Varanasi. Prior to the so-called rail bus, the pilot drives the pilot to go either through the rear engine. It does not turn out for four months. The service is often canceled due to technical difficulties in the engine. Travelers do not even use large trains because the train does not turn up properly. The line, which links Salare, Bobbili Municipal Townships and Regional Centers, was proposed in 1957. The central government has given...
more...
Railway branch to be set up between Bobbili and Saloru Railway Bazaar will be set up in Varanasi. Vizianagaram district: A new train will run on the Bobbili-Saloor railway line. The train will be set up by Railway Department. The train is also ready in Varanasi. Prior to the so-called rail bus, the pilot drives the pilot to go either through the rear engine. It does not turn out for four months. The service is often canceled due to technical difficulties in the engine. Travelers do not even use large trains because the train does not turn up properly. The line, which links Salare, Bobbili Municipal Townships and Regional Centers, was proposed in 1957. The central government has given...
more...