Jan 14 2018 (20:36) 22158/Chennai Egmore - Mumbai CSMT SF Mail (PT) | SUR/Solapur (5 PFs)
psanga_sur^~
psanga_sur^~ 5601 blog posts#PuneSolapurDoubling
1. Construction of second line between Wakav and Kurduwadi is completed.
2. Another platform at Wadshinge and Madha constructed.
3. New signals installed in this section.
4. Only Kurduwadi outer to Kurduwadi Station...
more...
1. Construction of second line between Wakav and Kurduwadi is completed.
2. Another platform at Wadshinge and Madha constructed.
3. New signals installed in this section.
4. Only Kurduwadi outer to Kurduwadi Station...
more...
53 Posts
He meant that they are at advanced stage and can complete soon.
Actually by this time doubling should have been completed in this stretch god knows when there in efficient cr will complete the doubling work.