Jan 16 2018 (11:06) 17617/Tapovan Express | AWB/Aurangabad (5 PFs)
ssastronaut~
ssastronaut~ 919 blog postsDivya Marathi ans Sakaal Aurangabad Edition. 16-01-2018
#AurangabadNews
Foot by foot final location survey started for electrification of Manmad-Mudkhed-Adilabad, Purna-Akola and Parbhani-Parli section of SCR. Work will start from April 2018
#AurangabadNews
Foot by foot final location survey started for electrification of Manmad-Mudkhed-Adilabad, Purna-Akola and Parbhani-Parli section of SCR. Work will start from April 2018
3 Posts
औरंगाबाद में पिट लाइन नही बना रहे करके DRM ने यह लड्डू दिया
Ye laddu dia ek sath do kaam ek piyushji ko batana k unka 4 sal me sare BG electrification ko pura kar rahe idhar marathwada ko bolna ki dekho how much scr cares for u
1 pole se dusre pole ke bhitar kitna foot rehna chahiye?
There may be about 18 to 20 poles in 1 km distance.
1000m /20 poles=50 metre
1000m/19 poles= 52.63 metre
1000m/18 poles=55.55 metre
depend on curves
1000m /20 poles=50 metre
1000m/19 poles= 52.63 metre
1000m/18 poles=55.55 metre
depend on curves
ranges widely, from upto 72 metres for straight track, to as low as 27 metres for curvy ones.
generally, on straight tracks you'll see 72 metre span, and somewhat lower (the reduction in span is in steps of 4.5 m, so span will reduce like 67.5, 63, 58.5 etc) when there are curves.
generally, on straight tracks you'll see 72 metre span, and somewhat lower (the reduction in span is in steps of 4.5 m, so span will reduce like 67.5, 63, 58.5 etc) when there are curves.