Blog Entry# 3006840
Posted: Jan 16 2018 (12:35)

11 Responses
Last Response: Mar 13 2018 (20:38)
Info Update
102478 views
5

Jan 16 2018 (12:35)   THAL/Thal
Ben_Kenobi~
Ben_Kenobi~   4222 blog posts
Entry# 3006840            Tags  
hello everyone, hope everyone's doing fine :)
before I yet again disappear for tens of weeks there is small electrification update i wish to make
So, few days back I was doing my usual Mumbai-Alibag-Mumbai weekend journey, when shortly after leaving Goa highway (NH 66) and turning on to NH 166A I spotted a weird grey looking pole obliquely standing in soil. That, as you might have guessed were new electric poles which were being erected. the next time I traveled that route I ws alert and wanted to see if there
...
more...
is any sign of electrification from PNVL end, but there isn't. Poles start appearing only after the line to TVSG (TVSG is the correct station code, not Thal as mentioned here) diverges out, but once they start appearing they are visible till quite some distance, until the track turns away. I believe the electrification has been started from TVSG end and will keep on progressing outward towards Panvel via Pen. This obviously needs cofirmation, and i infact know of a place not much far from the industry the line ends at which will allow me to see unhindered for almost 5-ish Kms close to the end of TVSG, but currently it is difficult for me to reach there.
why is this important?
Because the e-fication from TVSG is actually a part of the TVSG-PEN-PNVL e-fication project. It was mentioned first in the 2015-16 pinkbook, and the beginning and in fact rapid progress of the work currently indicates that the work may be complete by the end of the year. the next phase, involving PEN-ROHA electrification can then start which would allow for, if railways plans to, run some MEMU on the new slots created on the recently doubled line on PNVL-ROHA route.
what exactly is this line?
the lines where poles are currently visible is not a part of mainline, but is a rather long 'private siding' that is connected to three firms:
1)RCF Ltd, where the line ends.
2)PPDP (PNP Dharamtar port), not marked on atlas. I have indicated it in image attached though, on OSM
3)JSWD (JSW Dolvi), marked wrongly on atlas, the line diverges shortly after the private siding diverges from mainline. the poles, when i last saw them, stop short of the place where the diverging happens.
#atlasmonitors take note please and add the corrections, and update the line to electrification in progress from single diesel line
pinkbook for RE 2015-16, showing sanction fo funds for Panvel-Pen-TVSG electrification. the relevant line is on page number 6
click here
Place I have shown in image: click here

Translate to English
Translate to Hindi
Show AI Response

8 Posts

18970 views
0

Feb 12 2018 (16:30)
Ben_Kenobi~
Ben_Kenobi~   4222 blog posts
Re# 3006840-9              
yes, it seems like it.
they around a Km or so line's poles disappeared, and a similar distance has reappeared on mainline :P
Translate to English
Translate to Hindi
Show AI Response

19114 views
0

Feb 12 2018 (16:34)
Irshad13~
Irshad13~   8101 blog posts
Re# 3006840-10              
Yes They might Replaced Poles from Private line to Main line.P
Translate to English
Translate to Hindi
Show AI Response

18793 views
0

Feb 22 2018 (10:52)
Reva18~
Reva18~   56837 blog posts
Re# 3006840-11              
TVSG - Rashtriya Chemicals and Fertilizers siding-Thal Vaishett
THAL - Thal
(As per RBS)
Translate to English
Translate to Hindi
Show AI Response

18444 views
1

Feb 24 2018 (13:49)
Ben_Kenobi~
Ben_Kenobi~   4222 blog posts
Re# 3006840-12              
Thal is the name of the area
TVSG is the name of the siding where it ends.
the area name would be applicable if this also had passeger service, but there is nothing of that sort here. once a train passes the home signal for the point where line towards PPDP diverges (not on atlas) the train will only end up at TVSG.
a
...
more...
similar analogy can be drawn for HESG (Bharat Heavy Electrical siding), if you check on RBS it shows distance between HBJ and HESG as 0, which makes sense as they are, for all intents and purposes, in the same place, but both have been given different names
area name makes sense only when talking about passenger used railway lines, ham garibon ke idhar bas maal gaadi guzarti hai :P

Translate to English
Translate to Hindi
Show AI Response

17989 views
0

Mar 13 2018 (20:38)
Ben_Kenobi~
Ben_Kenobi~   4222 blog posts
Re# 3006840-13              
atleast on Thal end, as seen today, no significant work has happened other than erecting poles
only poles exist, no wiring as of yet.
Translate to English
Translate to Hindi
Show AI Response
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy