Search Forum
Blog Entry# 3049424
Posted: Jan 29 2018 (10:07)
5 Responses
Last Response: Jan 31 2018 (02:31)
5 Responses
Last Response: Jan 31 2018 (02:31)
New Facilities/Technology
ER/Eastern
AmishKumar^~ 4295 news posts
भागलपुर : मार्च में टेकानी माल गोदाम में शिफ्ट हाे जायेगा, इसकी तैयारी लगभग पूरी हो गयी है. टेकानी में माल गाेदाम शिफ्ट होने के बाद...
Bgp me pit line kitna hai and kitna pil line banega
There is plan to build 2 new washing pit lines, one 513m long and another 379m, long enough to handle 22 and 17 coach trains. Currently, there are 2 pit lines, each of 550m length, and one washing pit of 555m length. They can handle 24 coach rakes.
There is also another facility planned to build 3 washing pit lines for 24 coach rakes, with hydrant and street light facilities. The location will be between the Mandar Hill line and railway colony. I have also read in newspapers (unconfirmed) that Bhagalpur coaching depot will be exclusively for LHB rakes, and ICF rake maintenance will be shifted to Tikani.