Search Forum
Blog Entry# 3089018
Posted: Feb 09 2018 (19:50)
7 Responses
Last Response: Feb 11 2018 (08:17)
7 Responses
Last Response: Feb 11 2018 (08:17)
Purulia kotshila doubling work has started.but does it include the doubling of purulia bokaro short route via garh jaipur ie the purushottam exp route.also is there a talk of introducing auto signalling system from chandil to burnpur.
2 Posts
Your information is wrong. The trains that pass through this bypass link are Purushottam Express, Jallianwalabagh Express and BKSC-ASN MEMU. It is not a big number. Just 3 trains that too with no clash. The Barbenda-Damrughutu link even if single will not matter but Purulia-Barbenda with loops is required.
Bt what i heared from a railway official today is that the short route is on course to be doubled for more trains to be run on that way.also it reduces travel time
Line to Kotshila as well as link track to Damru Ghutu will be doubled with fly overs and subways. I had a doc containing every information of track works in SER.
Good then. May be it then trains like SRC-ANVT, SHM-GKP and HLZ-ANVT can be diverted via BKSC.