Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Darjeeling Mail - উত্তরবঙ্গের ঐতিহ্য - Joydeep Roy

Search Forum
<<prev entry    next entry>>
Blog Entry# 3108284
Posted: Feb 15 2018 (17:05)

6 Responses
Last Response: Feb 15 2018 (18:23)
Station Tip
177141 views
7

Feb 15 2018 (17:05)   MLDT/Malda Town (7 PFs)
Rohit Kumar Kushwaha~
Rohit Kumar Kushwaha~   115 blog posts
Entry# 3108284            Tags  
Escalator is being installed in full pace at PF No. 1 in Malda Town Station.
Translate to English
Translate to Hindi

1 Posts

159199 views
1

Feb 15 2018 (17:37)
Rohit Kumar Kushwaha~   115 blog posts
Re# 3108284-2              
Impossible from 25/02/2018. Railway is playing joke with General public no pole had been erected entirely at New Farakka Junction, Farakka Barrage and Malda Town Railway station.
Hole are being dug out from 08/02/2018 at New Farakka North end cabin and Malda Town station
You can watch match my videos on Youtube there are no sign of electrification work near New Farakka Jn.
Translate to English
Translate to Hindi

159534 views
0

Feb 15 2018 (17:43)
Poor_People^~   17189 blog posts
Re# 3108284-3              
And you here what they say .. energisation from 25.02.2018 ... How could it be possible without ohe n poles
Translate to English
Translate to Hindi

158715 views
1

Feb 15 2018 (17:52)
AmishKumar^~
AmishKumar^~   12524 blog posts
Re# 3108284-4              
Kiul- jmp already energized from dec17 even no wires at all...,,😂 ER🙏
Translate to English
Translate to Hindi

158192 views
0

Feb 15 2018 (18:12)
Brahman^~
Brahman^~   10903 blog posts
Re# 3108284-5              
Is Energization notice dene ka reason kuch or ho sakta hai jisse hum samjh nai paa rahe
Translate to English
Translate to Hindi

158710 views
0

Feb 15 2018 (18:23)
Rohit Kumar Kushwaha~   115 blog posts
Re# 3108284-6              
Actually they give energisation notification early to create general awernance within the public.
Katihar Malda Court Energisation notification was released on December 2016 with no Catenery installed at Malda Court Station but the section became electrified on December 2017.
Here the synerio is different as No pole has been erected and SSP at Kaltipur is not ready at all only boundary has been made.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy