munirabad (hulgi) rs new 2nd plat form
1.new sb at 2nd pf
2.new 2nd plat form
3.new fob under construction connecting pf 1& 2
4.2nd pf shelter
5.new...
more...
1.new sb at 2nd pf
2.new 2nd plat form
3.new fob under construction connecting pf 1& 2
4.2nd pf shelter
5.new...
more...
8 Posts
For a brand new route, yes - track linking is pretty much the same as interlocking. However, when new tracks are constructed at a station, some of the existing interlocking arrangements have to be removed to restructure the system for adding the new lines. For example, in a single line section, usually the platform lines are interlocked in such as way as to allow bi-directional train movement. After the route is converted to a double line section. the bi-directional movement is no longer necessary and some points and signals no longer need to be interlocked. So, non-interlocking work is carried out and the related interlocking work for the new sidings and signals is also carried out. such non-interlocking is also done when there are signalling system upgrades.
...
more...
...
more...
Gangavathiyalli yavaga hosa railu praramba antha mahithi ideya?
Cnf news illa ..May be March or April..I was travelling on 15th Jan last month via gangavathi. ..I saw station work at finish ing stage like painting , fixing electrical wires , ties fixing , shelter,etc.. still 500mts track laying work left .
Gangavathi prantha vyavasaya utpathi ella Munirabad nalli loading madthira ??