Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Everyone knows if a train is running late, ONLY RailFans know WHY it is late

Search Forum
<<prev entry    next entry>>
Blog Entry# 3189535
Posted: Mar 10 2018 (11:06)

13 Responses
Last Response: Mar 11 2018 (20:14)
Poll
14691 views
12 votes
1

Mar 10 2018 (11:06)   MAS/MGR Chennai Central (12 PFs)
ER_PRAGADESH_SK_NGT^~
ER_PRAGADESH_SK_NGT^~   17660 blog posts
Entry# 3189535            Tags   Past Edits
This poll is about development in Chennai Division. According to you, what is the major change in train pattern needed for chennai city?
for your kind references:
1.circular chennai emu requires AJJ Takolam line completion
2. MLMR emus require one more emu shed terminal in south
3.
...
more...
VLR emu requires one more emu shed terminal in vellore.
4. GPD emu requires quadrapling first
5. VLCY MRTS chennai is planned for transfering lines to metro.
6. for any major changes, MSB WST needed to be tripled. works going on dono when it will be finished.
Kindly vote

Translate to English
Translate to Hindi
ENDED
NO vote
more circular emu in MSB MSB via AVD TRL AJJ CJ CGL TBM
42%
5
more memu needed in MLMR MSB line. a new terminal can be developed in south of TMV.(mailam or vikravandi)
8%
1
more memu needed in KPD MAS section so VLR can be developed for that
8%
1
more emu needed for GPD side especially from TBM. CGL. even mmc SPE emu frequency need to be increased.
8%
1
more interconnecting emus like CGL GPD. VLCY VLR. TBM TRT needed.(can be done as fast memu)
8%
1
VLCY can be made as terminal and VLCY STM can be given to metro. so VLCY emu shed can be used.
0%
0
I have own suggestion to improve chennai trains.
17%
2
Existing trains are sufficient. Chennai has more than what it need.
8%
1

10 Posts

2727 views
3

Mar 10 2018 (16:57)
BangaloreMail^~
BangaloreMail^~   26559 blog posts
Re# 3189535-11              
Third/fourth track required. Else new EMU services would be tough.
Translate to English
Translate to Hindi

2897 views
3

Mar 10 2018 (17:18)
K.V.A.~
K.V.A.~   14718 blog posts
Re# 3189535-12               Past Edits
1.watsoever stm vlcy potta semma Crowd movement irukum cmrl fare knjm reduce panna crowd movement is in next lvl
2.Mailam vara some services especially peak hrs vidanum
3.then gpd quadrupling and some more services cgl means tripling daan possible....
4.peak time la long emu like vlcy,cgl to ajj,gpd vidalaam
Translate to English
Translate to Hindi

2883 views
2

Mar 10 2018 (21:23)
Aravind KS~   184 blog posts
Re# 3189535-13              
More long distance EMUs to the south and west should be added (option 2) . I want to vote for option 5 as well
Translate to English
Translate to Hindi

2879 views
1

Mar 10 2018 (22:23)
netravathiexp~   11036 blog posts
Re# 3189535-14               Past Edits
Mixed opinions anna.
Prerequisites:
CGL TBM tripling, AJJ Takkolam Efication
1. Interconnecting EMUs are really required so that all the parts of this city are well connected and easy for commuters who need to take a transit. Also in RSA basis maintenance could be simplified.
2.
...
more...
As far as I feel, VLCY shed is underutilised. So VLCY STM connection may act as an alternative route and also in the name of maintenance VLCY shed could be well utilised.
3.Circular EMUs are welcome but AJJ Takkolam needs completion.
4. Frequency of MLMR MSB VLR EMUs could be increased.

Translate to English
Translate to Hindi

2429 views
0

Mar 11 2018 (20:14)
ER_PRAGADESH_SK_NGT^~
ER_PRAGADESH_SK_NGT^~   17660 blog posts
Re# 3189535-15              
more votes pls.. all options got 1 vote each. i also getting mixed suggestions.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy