Search Forum
Blog Entry# 3201129
Posted: Mar 14 2018 (00:01)
3 Responses
Last Response: Mar 14 2018 (13:25)
3 Responses
Last Response: Mar 14 2018 (13:25)
Demands of Tiruppur District people put forward by MP of Tiruppur Mrs.SatyaBama..
Some among these,
1. Increase in frequency of 22475/6/16613/4 and extension of 22475/6 to ED.
2. Extension of passenger trains MTP CBE TCR CBE SRR CBE and such to TUP and SA KPD MEMU to TUP.
3....
more...
Some among these,
1. Increase in frequency of 22475/6/16613/4 and extension of 22475/6 to ED.
2. Extension of passenger trains MTP CBE TCR CBE SRR CBE and such to TUP and SA KPD MEMU to TUP.
3....
more...
Rajkot is passing through TUP, ED, then why?
Extension of BKN AC is must, as Salem and CBE has got BKN connection, but not Erode..
Extension of BKN AC is must, as Salem and CBE has got BKN connection, but not Erode..
How can they introduce or extend trains to/from Tup???
There is no facilities of operating a train from tup eg:pit or stable lines, platform availability.....
Instead of extending cbe bkn ac exp, they should think of a new train as cbe bkn exp is much demanded in cbe-bkn section itself.....
Maq-cbe and srr-cbe extensions is impossible....
There is no facilities of operating a train from tup eg:pit or stable lines, platform availability.....
Instead of extending cbe bkn ac exp, they should think of a new train as cbe bkn exp is much demanded in cbe-bkn section itself.....
Maq-cbe and srr-cbe extensions is impossible....